ad-100000614
"Install carbon monoxide monitors... combustion appliances or garages. " change to "Install carbon monoxide monitors... combustion appliances or garages. In multi-family buildings, CO monitors must be installed in each unit."
"Install carbon monoxide monitors... combustion appliances or garages. " change to "Install carbon monoxide monitors... combustion appliances or garages. In multi-family buildings, CO monitors must be installed in each unit."
"Select fireplaces and woodstoves that are vented and have tight-fitting doors." change to "If a fireplace or woodstove is installed, ensure that it is vented and has tight-fitting doors or a solid glass enclosure. The requirement for doors is met if the fireplace has a solid glass enclosure."
Remove the heading "CASE 1. Non-Residential Projects"
To the left side of graph, remove a zero from the number "60000" so it becomes "6000"
Update "OPTION 3" to "OPTION 2"
In the sentence under Table 1 that begins with "Projects that earn," replace "each" with "one"
"The number of infiltration degree-days is equal to the sum of the cooling degree-days plus the heating degree-days for a particular location." change to "The number of infiltration degree-days is equal to the sum of the cooling degree-days plus the heating degree-days for a particular location. These exemptions are based on ASHRAE Std. 62.2-2004, which references ASHRAE Std. 119-1988 (RA 2004). Following this standard, LEED for Homes uses a base of 65
"A project pursing EQ 8.2 must meet all of the prerequisites in EQ 2-10." [delete]
[Add "OR" between 7.2 and 7.3]
Replace the third line "WE Credit 4, Option 2 Cooling Tower Water Management - Nonpotable Water Source Use" with "WE Credit 4.2 Cooling Tower Water Management - Nonpotable Water Source Use"