Smoking Site Plan
Provide a map showing that smoking is prohibited within 25 feet of building openings, and confirming that no smoking signage is posted within 10 feet of all building entrances.
Samples
Smoking Signage
Provide photos or drawings of the signage used to communicate the no smoking policy.
Samples
Webcast
Materials Transparency & LEED
This deep dive into the three Building Product Disclosure and Optimization (BPDO) credits in LEED v4 provides the rationale fo...
High-Reflectance Roof Surfaces
This example shows what information to look for on a product sheet for high-reflectance roof surfaces (Option 2 or Option 3).
ARUP.London (LU-TM)
Invit people
simon.krone@arup.com
OG Group
Visual Photometric Tool
One example of software that will calculate the BUG rating using the IES file for the luminaire.