Facility alterations or additions projects must meet specific LEED criteria to qualify for credit under MRc9. To reduce confusion during the LEED review process, include a narrative in the credit form that clearly describes the scope of the alterations/ad

Facility alterations or additions projects must meet specific LEED criteria to qualify for credit under MRc9. To reduce confusion during the LEED review process, include a narrative in the credit form that clearly describes the scope of the alterations/addition. The narrative should demonstrate that the work meets the minimum requirements and should substantiate the list of diverted materials claimed in the credit form.

Buildings that have already been certified under any version of the LEED for Existing Buildings rating system are eligible for this credit. Teams must demonstrate consistent implementation of strategies and tracking of performance data over the recertific

Buildings that have already been certified under any version of the LEED for Existing Buildings rating system are eligible for this credit. Teams must demonstrate consistent implementation of strategies and tracking of performance data over the recertification performance period. See the USGBC’s Recertification Guidance released November 2012 for details about documentation requirements for this path. See the Bird's Eye View for additional information.

It is no longer required to track existing reused equipment. Refer to the following LEED Addendum posted on 4/16/10. “Only new appliances and equipment purchased as part of the scope of work for the project need to be included in the credit for EA Credit

It is no longer required to track existing reused equipment. Refer to the following LEED Addendum posted on 4/16/10. “Only new appliances and equipment purchased as part of the scope of work for the project need to be included in the credit for EA Credit 1.4. Equipment and appliances must meet the Energy Star criteria current at the time of purchase. Any items that are purchased after the item's category has become ENERGY STAR eligible must meet the Energy Star rating.

If you don't make any durable goods purchases during your regular performance period, you can extend the performance period for this credit back to include older qualifying purchases. Remember that the performance period for any prerequisite or credit can

If you don't make any durable goods purchases during your regular performance period, you can extend the performance period for this credit back to include older qualifying purchases. Remember that the performance period for any prerequisite or credit can last for a maximum of 24 months, at the discretion of the project team, but all performance periods must overlap and terminate within 30 days of each other.