Skip to main content

You are currently logged in under an enterprise account

Before making a purchase, you'll need to login to your personal profile or create one now.

Home
Go to BuildingGreen.com
  • Go to BuildingGreen.com
Top navigation
  • About
  • CEUs
  • Exam Prep
  • Reports
  • FAQ
  • Pricing
  • Support
Menu user
  • Login
Home
Main navigation
  • LEED Credits
  • Forum
  • Blog
  • Tip sheets

Firm or campus member?

Please log in using your personal profile:
Log in »   Create personal profile »
You’re Already Subscribed

You're already enjoying full Premium access. No need to subscribe again.

When an aspect of your project site is in question, check the intent of the credit and the referenced standards that apply to your situation, and realize that rarely are there exemptions for this credit. As always, check the LEED Interpretations page for

Submitted by on
  • Read more about When an aspect of your project site is in question, check the intent of the credit and the referenced standards that apply to your situation, and realize that rarely are there exemptions for this credit. As always, check the LEED Interpretations page for

When an aspect of your project site is in question, check the intent of the credit and the referenced standards that apply to your situation, and realize that rarely are there exemptions for this credit. As always, check the LEED Interpretations page for past CIRs and other scenarios in which the GBCI has made a ruling.

For commercial buildings, systems like fan coils paired with dedicated outdoor air systems can help provide local control to occupants, while reducing first-cost expenses like duct-work.

Submitted by on
  • Read more about For commercial buildings, systems like fan coils paired with dedicated outdoor air systems can help provide local control to occupants, while reducing first-cost expenses like duct-work.

For commercial buildings, systems like fan coils paired with dedicated outdoor air systems can help provide local control to occupants, while reducing first-cost expenses like duct-work.

You can pursue an innovation point by expanding the durable goods recycling program and inviting your tenants to bring in their durable goods from home.

Submitted by on
  • Read more about You can pursue an innovation point by expanding the durable goods recycling program and inviting your tenants to bring in their durable goods from home.

You can pursue an innovation point by expanding the durable goods recycling program and inviting your tenants to bring in their durable goods from home.

Lamps should not be included.

Submitted by on
  • Read more about Lamps should not be included.

Lamps should not be included.

Be sure to include in the waste audit report a rationale for why the time period you choose to do the waste audit was representation of a typical work day/week/or other time period (i.e. not on a holiday).

Submitted by on
  • Read more about Be sure to include in the waste audit report a rationale for why the time period you choose to do the waste audit was representation of a typical work day/week/or other time period (i.e. not on a holiday).

Be sure to include in the waste audit report a rationale for why the time period you choose to do the waste audit was representation of a typical work day/week/or other time period (i.e. not on a holiday).

Research the recycling rules that govern the project building prior to conducting a waste audit in order to accurately assess whether have items have been recycled properly or not.

Submitted by on
  • Read more about Research the recycling rules that govern the project building prior to conducting a waste audit in order to accurately assess whether have items have been recycled properly or not.

Research the recycling rules that govern the project building prior to conducting a waste audit in order to accurately assess whether have items have been recycled properly or not.

Ensure that HVAC and lighting systems are returned to the designed or modified sequence of operations after construction. This step should be included as part of the construction IAQ plan.

Submitted by on
  • Read more about Ensure that HVAC and lighting systems are returned to the designed or modified sequence of operations after construction. This step should be included as part of the construction IAQ plan.

Ensure that HVAC and lighting systems are returned to the designed or modified sequence of operations after construction. This step should be included as part of the construction IAQ plan.

If the number of regular building occupants increases during the performance period but you’ve already conducted the survey, you do not need to re-do the survey. You can calculate the response rate based on the occupancy at the time of the survey.

Submitted by on
  • Read more about If the number of regular building occupants increases during the performance period but you’ve already conducted the survey, you do not need to re-do the survey. You can calculate the response rate based on the occupancy at the time of the survey.

If the number of regular building occupants increases during the performance period but you’ve already conducted the survey, you do not need to re-do the survey. You can calculate the response rate based on the occupancy at the time of the survey.

If occupancy is below 50% during the performance period the survey cannot be conducted during that time.

Submitted by on
  • Read more about If occupancy is below 50% during the performance period the survey cannot be conducted during that time.

If occupancy is below 50% during the performance period the survey cannot be conducted during that time.

The regional criterion is often a better fit for simple foods like fresh fruits, vegetables, and dairy. For foods made with several ingredients, you may have an easier time focusing your efforts on the approved third-party certification programs, rather t

Submitted by on
  • Read more about The regional criterion is often a better fit for simple foods like fresh fruits, vegetables, and dairy. For foods made with several ingredients, you may have an easier time focusing your efforts on the approved third-party certification programs, rather t

The regional criterion is often a better fit for simple foods like fresh fruits, vegetables, and dairy. For foods made with several ingredients, you may have an easier time focusing your efforts on the approved third-party certification programs, rather than trying to track the source location of each ingredient.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 1219
  • Page 1220
  • Page 1221
  • Page 1222
  • Current page 1223
  • Page 1224
  • Page 1225
  • Page 1226
  • Page 1227
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
logo-footer
Footer
  • Contact us
  • BuildingGreen
  • Jobs at BuildingGreen
  • Terms & Conditions
  • Privacy Policy

© 2026 BuildingGreen, Inc. All rights reserved except where noted.

Reseau Sociaux