100002110

Add new section: Rating System Variations
Multifamily
This credit includes tracking waste generated by unit turnover activities.

ad-100000573

"Projects that implement advanced framing measures worth more than 3 points can take credit for the additional measures, to be counted under Innovation & Design 3." change to "Projects that install measures from MR 1.4 such that more than 3 points are earned may be awarded exemplary performance points, to be counted under Innovation & Design 3."

ad-100000602

"Meeting Indoor Air Package specifications achieves prerequisites EA 6.1(a) and 6.1(c)." change to "Meeting Indoor airPLUS specifications achieves prerequisites EA 6.1 (a) and EA 11.1."

ad-100000588

"100% of the floor area must meet the Low-Emissions Materials requirements..." change to "90% of the floor area must meet the Low-Emissions Materials requirements..."

ad-100000587

[Add new paragraph just after 1st paragraph]"For example, in order to earn credit for the component "Interior Walls AND ceiling AND millwork", at least 90% of all paints and coatings used on these surfaces must meet the requirements."

ad-100000586

"...and check emissions levels on product labels." change to "...and check emissions levels on product labels. Pre-finished surfaces are assumed to meet the emissions specification."