All the design work is implemented during construction. Have the project architect ensure that the glazing is per your specifications and that the façade system incorporates a continuous air barrier. The commissioning agent will ensure all equipment purch

All the design work is implemented during construction. Have the project architect ensure that the glazing is per your specifications and that the façade system incorporates a continuous air barrier. The commissioning agent will ensure all equipment purchased is exactly what the engineer required, and that all pumps and fans meet the specifications.

Value engineering and other factors can result in design changes that eliminate certain energy features relevant to the credit. As this compliance path is prescriptive, your project cannot afford to drop even one listed item. Although perceived as high-co

Value engineering and other factors can result in design changes that eliminate certain energy features relevant to the credit. As this compliance path is prescriptive, your project cannot afford to drop even one listed item. Although perceived as high-cost, prescriptive requirements lower energy costs during operation and provide a simple payback structure.