Have the commissioning agent, mechanical engineer, or O&M staff review the survey draft and develop the plan for corrective action. Involve the owner in this process and be sure that he or she understands the purpose of the survey and plan for correct

Have the commissioning agent, mechanical engineer, or O&M staff review the survey draft and develop the plan for corrective action. Involve the owner in this process and be sure that he or she understands the purpose of the survey and plan for corrective action. It is best for the owner to sign off on the LEED documentation, verifying the implementation of the survey, and the development of the corrective action plan. 

Develop the thermal comfort survey after determining space programming, designing the mechanical system, and confirming compliance with EQc7.1. It is best to customize the occupant survey for the building’s planned HVAC systems. Questions may be structure

Develop the thermal comfort survey after determining space programming, designing the mechanical system, and confirming compliance with EQc7.1. It is best to customize the occupant survey for the building’s planned HVAC systems. Questions may be structured differently depending on whether you are assessing the performance of an evaporative cooling system, an in-floor radiant heating system, or a natural ventilation system.