Include in your new wood materials baseline budget the material cost (excluding labor) of all new wood items that apply under CSI Master Spec 1995 Format Divisions 2–10. Division 12 Furniture is optional. Mechanical, electrical, plumbing and equipmen

Include in your new wood materials baseline budget the material cost (excluding labor) of all new wood items that apply under CSI MasterFormat Divisions 03–10, 31 (31.60.00 Foundations), and 32 (32.10.00, Paving, 32.30.00 Site Improvements, and 32.90.00 Plantings). Division 12 Furniture is optional as long as it is consistently applied across all credits. Mechanical, electrical, plumbing and equipment costs are excluded. (See Resources for Master Spec information.)

Streamline documentation and research by taking data gathered from subcontractors via the Environmental Materials Reporting Form and transfer it into a master spreadsheet for all the items being tracked for each product across MR and IEQ credits. For exam

Streamline documentation and research by taking data gathered from subcontractors via the Environmental Materials Reporting Form and transfer it into a master spreadsheet for all the items being tracked for each product across MR and IEQ credits. For example, you may need to ask the millworker for rapidly renewable information for MRc6, certified wood information for MRc7, and information about adhesives installed on site for EQc4.1. If one spreadsheet collects all the data, it can streamline your documentation, associated research, and help with quality control.