Maintain a building operating plan (BOP) that establishes operating schedules and set points and regularly review these parameters against actual building needs. When developing these parameters, consider both time-of-day and time-of-year variations in op

Maintain a building operating plan (BOP) that establishes operating schedules and set points and regularly review these parameters against actual building needs. When developing these parameters, consider both time-of-day and time-of-year variations in optimal temperature requirements and be careful to avoid over-conditioning the building spaces with more ventilation, heating or cooling than is necessary.

Instead of tracking recycled content in everything, focus first on “big ticket” items, materials like structural steel, masonry products and gypsum board to see if you get enough value from them to earn the credit. This approach allows you to Iimit the ov

Instead of tracking recycled content in everything, focus first on “big ticket” items, materials like concrete, structural steel, masonry products and gypsum board to see if you get enough value from them to earn the credit. This approach allows you to Iimit the overall number of items you need to track and document, reducing contractor headaches. If big-ticket items are not enough, target a medium-priced item next, and so on, until you reach your goal.

At least eight of the ten required services must be operational at the time of project completion. For services that are nonexistent but proposed (up to two of the ten required services), the project team must demonstrate that these services will at least

At least eight of the ten required services must be operational at the time of project completion. For services that are nonexistent but proposed (up to two of the ten required services), the project team must demonstrate that these services will at least be in construction by the time the project is finished. This can be documented by signed lease agreements or a letter from the developer or owner stating the scheduled opening of the service.