Make sure your environmental professional provides a summary of the asbestos inventory and a plan for its remediation. The plan must document the type, amount, and location of the contamination, and create a remediation plan following EPA Reg. 40-CFR-763

Make sure your environmental professional provides a summary of the asbestos inventory and a plan for its remediation. The plan must document the type, amount, and location of the contamination, and create a remediation plan following EPA Reg. 40-CFR-763 and the National Emission Standards for Hazardous Air Pollutants (NESHAP) program. This will serve as your documentation for this credit.  

If your project building was built prior to the late 1970s, there may be some form of asbestos present in piping insulation, siding, or other materials. If you are undergoing major renovations, it’s likely that some asbestos will need to be removed from t

If your project building was built prior to the late 1970s, there may be some form of asbestos present in piping insulation, siding, or other materials. If you are undergoing major renovations, it’s likely that some asbestos will need to be removed from the building or remediated. However, not all types need to be remediated. To determine whether you will need to remediate asbestos on your project site, hire a qualified environmental professional to inventory asbestos and document it according to EPA Reg. 40-CFR-763 or similar state or local standard, whichever is most stringent.