Prepare documentation for submission to LEED Online. These documents should include:A summary of the asbestos inventory, signed by an environmental consultant qualified in asbestos investigation.A summary of the remediation plan and its implementati

Prepare documentation for submission to LEED Online. These documents should include:

A summary of the asbestos inventory, signed by an environmental consultant qualified in asbestos investigation.
A summary of the remediation plan and its implementation, including reference to compliance with NESHAP or similar standard, signed by a qualified asbestos removal contractor. 

Depending on the extent and type of remediation required, it is possible that some site features may be affected. For example, it may be less expensive to cap contaminated soils with concrete, leaving no room for landscaping or stormwater infiltration. Th

Depending on the extent and type of remediation required, it is possible that some site features may be affected. For example, it may be less expensive to cap contaminated soils with concrete, leaving no room for landscaping or stormwater infiltration. This can have an effect on other site credits your project is attempting, such as SSc5.1: Protect or Restore Habitat and SSc6.1 and SSc6.2: Stormwater Management.