If attempting one or both of the stormwater management credits SSc6.1 and SSc6.2 confirm with the contractor that the SWPPP accurately represents the hydrologic characteristics of the site and is performing as anticipated. Check on assumed infiltration ra

If attempting one or both of the stormwater management credits SSc6.1 and SSc6.2 confirm with the contractor that the SWPPP accurately represents the hydrologic characteristics of the site and is performing as anticipated. Check on assumed infiltration rates, suspected rate and quantity of run-off to receiving streams, and discuss potential storage options. Make changes to the stormwater management system accordingly to improve its effectiveness and ensure that the credit calculations are accurate.

Careful implementation of the stormwater pollution prevention plan (SWPPP) by the contractor should inform the design and installation of stormwater management systems onsite. This will enable those systems to be integrated to the greatest extent possible

Careful implementation of the stormwater pollution prevention plan (SWPPP) by the contractor should inform the design and installation of stormwater management systems onsite. This will enable those systems to be integrated to the greatest extent possible during construction, preventing unexpected stormwater discharges into receiving waterways.