ad-100000849

In "3 years after build-out" section, change the period at the end of the second line to a semicolon and add a new line with the text "NPDc8 TDM program funding commitment."

ad-100000806

Insert the term "major renovations" in alphabetical order with the accompanying text "major renovations extensive alteration work in addition to work on the exterior shell of the building and/or primary structural components and/or the core and peripheral MEP and service systems and/or site work. Typically, the extent and nature of the work is such that the primary function space cannot be used for its intended purpose while the work is in progress and where a new certificate of occupancy is required before the work area can be re-occupied."

ad-100000743

At the end of the 3rd paragraph, add the following text:For major renovation projects whose scope of work includes onlyinterior renovation, identify areas of potential pollution fromconstruction activities including construction staging and access, anddevelop a plan that addresses these areas. Potential pollution couldinclude pollution of the site or air with dust and particulate matter.

ad-100000883

Remove the second sentence, "If CFC-based refrigerants are located, the building owner should develop a phase-out plan and convert to less environmentally harmful refrigerants."

ad-100000881

Replace the two bulleted items with the following:?Qunit = Gross ARI rated cooling capacity of an individual HVAC or refrigeration unit (tons)?Qtotal = Total Gross ARI rated cooling capacity of all HVAC or refrigeration