Hi , I am working on a 100, 000 sqft office building with 50% of the spaces being storage which are served by MAU with gas heat, looking at the baseline system it comes with system 5 VAV with reheat , do i model these storage as system 5 and use the same cooling source that we have in baseline as in proposed or use some other system?
TIA
Rajat