Hi, 

WHat is the right way to model OA for LEED if Outdoor unit selected is bigger than what we sized for, for example for an RTU if the Min OA sized is 16,000 CFM but we selected Outdoor unit with 18000 CFM of OA, what is the right way to model it model it with 16,000 CFM or 18,000 CFM. We have 18,000 CFM on the Schedules.

TIA 

Rajat