Hi,

I was wondering if anyone knows the requirements for the secondary pump controls under the DES Path1 option? MEPC indicates dependency based on the capacity for chw and ft2 for the hot water systems. Is that valid both baseline and proposed pumps or baseline only? In other words can we select riding the pump curve for baseline and variable speed for proposed when proposed design includes variable speed controls?

Thank you