For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining the advance metering credit?
Thank you in advance for your feedback and consideration.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5906 thumbs up
February 6, 2024 - 5:05 pm
Yes, it does not have to be a utility meter. It just has to meet the advanced metering capabilities.