Hi , I submitted a Data center for LEED review in which I assumed that Data center load is operating is 100% at all the times in a year, now LEED is saying that I need to create 3  model one with Full IT loading, one with initial IT loading and baseline model with full IT loading. Has anyone gone through this, I was under the impression that we only have to model full IT load for both baseline and proposed.