Dear All,

I want to ask you how you approach taking into account the yield of the photovoltaic installation in the MEPC calculator.
I received the yield calculation from the designer and I am wondering which value to choose. I can choose from the following:
- the total energy produced by the panels on site
- energy produced minus what is rejected to the grid.

In my opinion, since the system operates on site it would be appropriate to take all the energy that the system is able to produce.

Thank you for your support.
 