Revise Option 2 to read as follows:
"Follow the Waste Management Plan and prevent waste through reuse and source reduction design strategies. Salvage or recycle at least 50% of renovation and demolition debris and utilize waste minimizing design strategies and construction techniques for new construction elements. Track all renovation and demolition debris generated by the project from start of construction through project completion. Also track all new construction waste materials generated from start of construction through project completion to determine the project’s total waste generation from new construction activities. Exclude hazardous materials and land-clearing debris from calculations. Points are awarded as follows:
Divert at least 50% of all renovation and demolition waste, if any. Generate less than 10 lbs./ft2 (50 kg/m2) of waste materials from all new construction activities (2 points)"