In the first sentence under Energy Related Systems, add "(EUI)" after "energy performance target"
Replace the Site Selection with the following:
"Assessment for Resilience
Conduct a risk assessment of any identified natural or environmental hazards affecting the project site(s) and building function out of the following:
• Sea Level Rise and Storm Surge
• Flooding
• Hurricane and High Winds
• Earthquake
• Wildfire
• Drought
• Landslides
• Extreme Heat
• Winter Storms
Demonstrate how the risk assessment influenced the project design and enhanced the project’s resilience to natural disasters, disturbances, and changing climate conditions; provide reasoning for not addressing any identified hazards."