For healthcare projects, projects must "install water meters in any five" water uses listed.  However, many of these water uses, such as dietary, laundry, laboratory, etc. include both cold and hot water lines.  Therefore, would separate meters on the cold and hot water lines for dietary department count as two of the five meters required?  If not, the credit could require 10 meters or more if the intent is to measure both cold and hot water use for these healthcare water uses.