Forum discussion

CS-v4.1 EAc5:Renewable Energy

Question about selecting v4 or v4.1

Hello to all users,

The Energy and Atmospere Category has a little bit different structure than in version v4.

In version v4.1 in Renewable Energy we can gain max 5 points vs 3 in v4.

Instead in v4.1 version the credit "Green Power and Carbon Offsets" doesn't exist any more.

I will register my project under version v4.

And mainly the category Energy and Atmoshepre, the most credit will be under v4.

Is there the possibility only for the credit " Renewable Energy" to go under v4.1? 

Is this possible in leedonline?

Thank you very much

 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 02/10/2023 - 08:34

Konstantina, I always register my projects under v4, then I choose whatever credits I want from v4.1 through pressing the round icon on the right with two little arrows in them on the credits tab on LEED Online. They turn blue when you have swapped the credit to v4.1. Hope this helps.

Fri, 02/10/2023 - 10:06

Yes Maria, It is clear now! Thank you very much!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.