I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g. office, lunch room, conference room), or can the flush-out be performed for the building as a whole (i.e. office+lunch room+ conference room)