Forum discussion

Warehouses-NC-v4.1 EAc2:Optimize Energy Performance

v4.1 & Photovoltaics VE

We are working on a warehouse in Sunnyvale, CA.  We are confused with the results from the spreadsheet (v3), since we investigated removing the PV array, as a VE measure.  Site Energy, Cosst, and GHG Emissions were at 110+% before, but are now at 44% for Site Energy, -1% for Cost, and 32% for for GHG Emmissions. 

The client feels we should have more points, but by our calculations, the values above leave us with 0 points for Cost, and 5 for GHG Emissions.  However, we're not always sure that the formulas are correct on the sheets, but since we can't see them, it's hard to tell.  We know that we're using an older version of the sheet.  Is there an easy(ish) way to port from sheet to sheet?  Knowing USGBC, probably not.  Any help is appreciated.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 06/29/2022 - 15:14

I don't know of an easy way to transfer everything from the v3 to the v4 spreadsheet, and I'm not aware of any errors in the v3 spreadsheet that woud result in incorrect points. You could try re-entering the results only in the v4 spreadsheet to see if the points change. 

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.