Does anyone find the additional requirements for O+M projects unnecessary? I'm not sure why a waste stream study is required for O+M when both options already specifically require that teams "Calculate or estimate the volume of organic waste generated from the project and corresponding capacity required."
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up