I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads. I have been bitten in the past on project where we opt for future on demand capability only to find that our systems don't really meet the intent. I would like to give our electrical engineer who has not worked on any ESVE, networking and net-meteing systems on what needs to be provided to outline the requirements better. Especially if an owner agreement (signed) is needed, etc. Has anyone achieved Option 2 ? or 1 and can elaborate?