Forum discussion

NC-v4.1 EQc4:Indoor Air Quality Assessment

Option 1 Air Testing - Use of Temporary Equipment for Flush-out

Hello! A question about approaching the v4.1 Option 1 credit requirements. In v4 the credit language states "Ventilation fans without supplemental cooling or heating, or temporary, supplemental HVAC units (installed in window or door openings) may be used, provided the outdoor conditions are within the required temperature and humidity constraints at all times during the flush-out. See the credit requirements."

Our team wanted to confirm, has the credit requirements for Option 1 Flush-out remained consistent regarding the use of temporary equipment?

Thank you!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.