I'm working on a project which is on a site that was in a Qualified Census Tract in 2019.  However, the site is no longer within a QCT.  The RFP went out for the project back in 2019, but the project is still in design.  Is there any guidance about when the site must be classified as a priority designation compared to the project timeline?