Forum discussion

LEED V4 Minimum Energy Performance Calculator Issue

Hi,

I tried asking this earlier but don't see where it ever posted. I am inputting my model data into the MEPC. There is a virtual rate table on the Performance Outputs tab that shows a significant difference between the baseline and proposed virtual electric rates. The difference is engough that even though I show a 12.6% savings in energy use, the energy cost savings is -40.1%.

Any idea how this energy rate is calculated or what I may have done to cause such a difference?

Thanks.
K.C. Clem

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.