For a warehouse project "Entryway systems are not required at doors leading from the exterior to the loading dock or garage but must be installed between these spaces and adjacent office areas."
Does the entryway system need to be on the office-side of the entrance, or could it be on the warehouse side?
'Between' is not all that clear, and it's certainly easier on the warehouse side.
Thanks in advance.
Dave Hubka
Practice Leader - SustainabilityEUA
LEEDuser Expert
526 thumbs up
May 21, 2021 - 12:19 pm
inside or outside the office door as long as the entryway is located undercover and position in the direction of travel.