For a warehouse project "Entryway systems are not required at doors leading from the exterior to the loading dock or garage but must be installed between these spaces and adjacent office areas."

Does the entryway system need to be on the office-side of the entrance, or could it be on the warehouse side? 

'Between' is not all that clear, and it's certainly easier on the warehouse side.

Thanks in advance.