The Reference Guide for this credit in both LEED v4 and v4.1 say "Analyze efficiency measures during the design process and account for the results in design decision making."  However, the following sentence from the LEED v4 Reference Guide was removed from the LEED v4.1 Reference Guide: "Project teams pursuing the Integrative Process credit must complete the basis energy analysis for that credit before conducting the energy simulation."  Since that sentence was removed in LEED v4.1, it seems to me that that if an energy model was used to analyze load reduction strategies in compliance with the IP credit, no additional energy modeling is required for the Optimize Energy Performance credit other than a final comparison of the Proposed and Baseline Energy Performance.  Is this correct?  If you interpret this differently, what language in the LEED v4.1 Reference Guide supports your interpretation?