Forum discussion

NC-v4.1 MRc3:Sourcing of Raw Materials

Sourcing of Raw Material threshold reduced to 15%?

A co-worker noticed today that the requirement language in the online LEED Credit Library for this credit has lowered the threshold of "products sourced...meeting criteria for at least 15% by cost of the total value of permanently installed building products". We cannot find an addendum to verify this. Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 04/09/2021 - 15:11

Interesting catch Tim! I just re-read it myself, and it sure does say 15% and 30%. The updated v4.1 BPDO calculator still says 20% and 40%, as does the LEED Online Form. From personal experience, 20% can be tough, so let's hope it is being dropped (though without it being in an addendum, I'm not holding my breath)

Fri, 04/09/2021 - 19:39

Hi everyone - yes, we are responding to stakeholder comments and have reduced the thresholds to 15% and 30% for this credit, respectively. These will be published in the April addenda. The updated calculator will be online soon. Also, the thresholds for EPD Option 2 and Material Ingredients Option 2 have also been streamlined, due to public comment. 

Mon, 04/12/2021 - 13:23

Thanks for chiming in Wes! I've searched the addenda database and don't see any publications yet for April, but will keep an eye out for sure!

Mon, 04/12/2021 - 18:21

The LEED v4.1 BUILDING DESIGN AND CONSTRUCTION Getting started guide for beta participants April 2021 (LEED_v4.1_BD_C_Guide_040921.pdf) within this link (https://www.usgbc.org/leed/v41#bdc) includes above changes.   RESOURCES -   

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.