Under CASE 2, replace language in its entirety with Options 1 and 2 from BD+C EA Credit 5: Measurement and Verification: "Option 1Develop and implement a measurement and verification (M&V) plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2) as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003.The M&V period must cover at least 1 year of post-construction occupancy.Provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved.OROption 2Develop and implement a measurement and verification (M&V) plan consistent with Option B: Energy Conservation Measure Isolation, as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003. The M&V period must cover at least 1 year of post-construction occupancy.Provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved."
Credits
Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Interior Design and Construction, 2009 edition$Green Interior Design and Construction, 2009 edition, updated June 2011$Retail Supplement to Green Interior Design and Construction, 2009 edition