Credits
Below the bulleted items, remove the following text:Develop and implement a measurement and verification (M&V) plan thatincorporates the monitoring information from the above end uses and isconsistent with Option B, C or D of the 2001 International PerformanceMeasurement & Verification Protocol (IPMVP) Volume I: Concepts andOptions for Determining Energy and Water Savings.Provide a process for corrective action if the results of the M&V planindicate that energy savings are not being achieved.
Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Interior Design and Construction, 2009 edition