Credits

In the sixth line of the second paragraph, replace "higher value (actual cost) in the calculations" with "higher value (actual cost) cost of the new equivalent item in the calculations"

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Building Design and Construction, 2009 edition