Credits

At the end of paragraph, add the following text:For projects that are a combination of renovated and new construction, use the following equation to determine minimum energy cost savings percentage for each point threshold for each line of the table:Target Percent = (Existing SF/Total SF)*Existing Percent + (New SF/Total SF)*New PercentOR

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Building Design and Construction, 2009 edition