Credits

Under the first bullet, add a second bullet with the following text:For projects where asbestos is found, prepare executive summary-levelcontent from the investigation\'s report explaining the extent of thecontamination and required action as well as documentation indicatingan acceptable level of remediation was achieved based on anacceptable standard, such as RCRA or NESHAPs.

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Interior Design and Construction, 2009 edition