Credits

Below the second bullet, add a third bullet with the following text:For projects where asbestos is found, prepare executive summarylevelcontent from the investigation\'s report explaining the extent ofthe contamination and required action as well as documentationindicating an acceptable level of remediation was achieved based onan acceptable standard, such as RCRA or NESHAPs.

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Building Design and Construction, 2009 edition