Replace the text under "CASE 1" with the following:There are no calculations required for this credit, unless a projectcannot limit site disturbance for every parameter. In such a case, anaverage is acceptable, as long as 3 of the 4 disturbance limits aremet. Project teams should calculate the amount of site disturbanceallowed under the requirements for greenfield sites and then theamount of actual site disturbance. The actual should be less than theallowable.