Credits
In Table 4, delete the first row entirely reading "Total Construction Cost" and in the second row change "Default Total Materials Cost (45% of total Construction Cost)" to "Total Materials Cost".
Date
Updated date
Campus Applicable
Off
Internationally Applicable
On
Ref Guide Name and Edition Pre-v4
Green Interior Design and Construction, 2009 edition, $ Green Interior Design and Construction, 2009 edition, updated June 2011