Option 1, Step 3: Add a bullet point at the end of the list that reads “Selected materials may meet either the initial SRI threshold or the 3-year aged SRI threshold. They are not required to meet both.”

Option 1, Step 4: Add a bullet point at the end of the list that reads “Selected materials may meet either the initial SR threshold or the 3-year aged SR threshold. They are not required to meet both.”