Edit the last sentence of the first paragraph under Option 2 to read as: "Achieve the waste generation thresholds in Table 1 and create a narrative describing how a project is addressing waste prevention and/or achieving waste generation thresholds via design strategies and onsite waste minimization practices."

BD+C Only: Edit the second paragraph under Option 2 to read as: "Do not generate more than 7.5 pounds of construction waste per square foot (36.6 kilograms of waste per square meter) of the building’s floor area for all BD+C projects except Warehouses and Distribution Centers.

BD+C Only: Edit Table 1: Thresholds of compliance for reduction of total waste material to reflect the attached resource.

-Modify the first paragraph under Step-by-Step Guidance a follows:
Option 1, Path 2 and Path 4 now include additional diversion thresholds using certified commingled recycling facilities. Choose between Path 1 and Path 2 (for 1 point) or Path 3and Path 4(for 2 points) if the goal is waste diversion. Choose Option 2 (for 2 points also) if the goal is waste reduction via waste prevention strategies in the design phase followed by jobsite best practices to reduce waste during construction.

Add an Exemplary performance section under Required Documentation:

Exemplary Performance
Achieve Option 1 - Path 3 or Path 4:
- If following Option 1 Path 3: Divert 85% and Four Material Streams
- If following Option 1 Path 4: Divert 85% using Certified Commingled Recycling Facility and Two More Material Streams
OR
Achieve both Option 1 (Path 3 or 4) and Option 2.