Update the credit requirement "Include the DR program and any installed technologies in the building systems manual." (Case 1 and Case 2) and "Include load flexibility and management strategies and installed technologies in the building systems manual." (Case 3) so that it reads as follows:

"Include the DR program and any installed technologies in the building systems manual, or include in the current facilities requirements and operations and maintenance plan if the project is not pursuing EA credit Enhanced Commissioning". (Case 1 and Case 2)

"Include load flexibility and management strategies and installed technologies in the building systems manual, or include in the current facilities requirements and operations and maintenance plan if the project is not pursuing EA credit Enhanced Commissioning." (Case 3)

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off