Revise the credit requirements to include Options as follows:
"Option 1. Purchase 20% by cost of permanently installed top three infrastructure materials
Comply with one or more of the following criteria for minimum 20% of total infrastructure material cost for permanently installed top three materials used in infrastructure. (1 point)
OR
Option 2. Purchase 40% by cost of permanently installed top five infrastructure materials
Comply with one or more of the following criteria for minimum 40% of total infrastructure material cost for permanently installed top five materials used in infrastructure. (2 points)"
In the Cities: Existing Rating System only:
Revise the second paragraph under Option 2 to read as:
"Include new construction, major renovation, repair or demolition works undertaken or contracted by the local government for a full calendar year within the past five years. Infrastructure includes but is not limited to roads and highways, transits, water supply and wastewater treatment plants, public spaces and parks."