Case 2. Demand Response Capable Building

1. Revise the first bullet point so it reads as follows: "Install interval recording meters and have equipment capable of accepting an external signal."

Case 3. Load Flexibility and Management Strategies

2. Revise the sentence that begins "All projects must install interval recording meters" so that it reads as follows:
"All projects must install interval recording meters and have equipment capable of accepting an external signal."

3. Load Flexibility and Management Strategies: Peak Load Optimization bullet point: after the phrase "demonstrate that strategy reduces on-peak load by at least 10% as compared to peak electrical demand" and before "(1 point)", insert the following text: "referenced to the ASHRAE 90.1-2016 compliant case"

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off