For a subset of buildings on a campus seeking LEED EB O&M certification, it is proposed to account for chilled water and hot water provided by a central plant by installing flow meters and temperature sensors on the lines into each building. In addition, energy used by the central plant (electricity for chilled water and fuel for hot water boilers) will be monitored so that the portion associated with delivered chilled or hot water to each building can be determined. Confirm if this approach is acceptable.
This is an acceptable approach. Applicable internationally.