Inquiry

The proposed project site is located on a military base that has potentially unexploded ordnance on-site.Protection from potential detonation during construction is required by the federal government to shield pedestrians and existing housing across the street from the project site. As a part of the project, a detonation barrier is to be constructed prior to start of excavation. This barrier can be built using various material but must have substantial foundations and structural strength to withstand large explosion forces. After construction is completed, the detonation barriers would be deconstructed to allow access to the site.The project team is proposing to incorporate salvaged local material into the design of these barrier walls. May the salvaged material qualify for MR credit 2 Construction Waste Managementif recycled after deconstruction?

Ruling

The project team has inquired whether materials used for a temporary (during construction) detonation barrier can be included within the construction waste management materials diverted since it is mandated to be built. If the temporary detonation barrier is recycled or salvaged after deconstruction, it meets the intent of MR Credit 2 (diversion from landfill and incineration) and may contribute towards construction waste management.

Internationally Applicable
Off
Campus Applicable
Off