Date
Inquiry
Can the surface area of existing streets be exempted from the impervious surface area used to calculate the stormwater volume to manage?
Ruling
For the purposes of GIBc8, project teams are allowed to exempt the surface area of existing street infrastructure that is a part of the public right of way (\'street\' as defined in the LEED-ND glossary) from the impervious surface area used to calculate stormwater volume to manage. Applicable Internationally.
Internationally Applicable
On
Campus Applicable
Off
Credits