There are two main components to this CIR with regards to the prerequisite (envelope / simplified approach with HVAC) detailed as follows: Maximum U-factor and SGHF requirements for the building envelope The majority of the building is naturally ventilated and only the three following areas are being air conditioned:- a) Room 1: Room 1 is air conditioned via an air cooled split package unit system consisting of an outdoor condensing/compressor unit coupled to an indoor air handling unit with a direct expansion cooling coil. The cooled air is distributed to the room via a network of insulated galvanized steel ductwork with ceiling mounted diffusers. b) Room 2: Room 2 is air conditioned via an air cooled variable refrigerant package unit system consisting of an outdoor inverter condensing/compressor unit coupled to a few indoor concealed ducted fan coil units. The cooled air is distributed to the room via a network of insulated galvanized steel ductwork with ceiling mounted diffusers. c) Area 3: The office and meeting rooms are air conditioned via an air cooled variable refrigerant package unit system consisting of an outdoor inverter condensing/compressor unit coupled to a few indoor concealed ducted fan coil units. The cooled air is distributed to the room via a network of insulated galvanized steel ductwork with ceiling mounted diffusers. With regards to the maximum U-factor and SGHF requirements on the building envelope it is suggested we apply only to parts of the envelope separating the air conditioned space with the outdoor space. We also understand there are some requirements for the envelope elements that are adjacent to the \'unconditioned space\' in the Semi-heated column of ASHRAE 90.1-2004 section 5.5.2 and figure 5-5 that we will need to be in compliance with. Simplified Approach Option for HVAC System Instead of complying with the mandatory provision of Section 6.4 of ASHRAE Std 90.1 - 2004, we propose the above mentioned approach based on Section 6.3 of the same standard. The standard allows building with gross floor area less than 2,300 m2 to follow this approach. Although the proposed building gross floor area is approximately 8,300 m2, the air conditioned area in this building is only approximately 1,230 m2. In addition, the proposed air conditioning system as described in Issue 1 (a), (b) and (c) is fairly simple system. Will this suggested building envelope and simplified HVAC System approach be acceptable?
To demonstrate compliance with ASHRAE 90.1-2004 using the prescriptive or trade-off approach, only those areas that are heated or cooled per section 2.2.(a) of the standard must comply with the envelope requirements. As for compliance with the HVAC section 6, the gross floor area of your project is greater than the 25,000 ft2 maximum required by section 6.3.1(b). Gross floor area represents the entire building floor area, not just the gross conditioned floor area. The HVAC systems must comply with the mandatory requirements in section 6.4. Note that the building systems must also meet the requirements of section 7, 8 and 9.